logo

Botwood Wind to Ammonia Development

Sector: Wind • Location: Botwood, NF, Canada

Source: Dodge

Project
Planning Schematics

A wind-to-ammonia project being proposed in Central Newfoundland could see up to 1,000 construction and 500 full-time jobs if its full capacity is reached. The proponents say the initial phase would amount to 1,000 megawatts of power produced by roughly 200 medium-sized turbines, but the potential is there for 3,000 megawatts.

Status
Prospective
Sector
Wind, Power Generation (CCGT), Hydrogen, Commercial
Location
Botwood, NF, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Botwood Wind to Ammonia Development

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Botwood Wind to Ammonia Development” is an infrastructure initiative in the Wind sector, located in Botwood, NF, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

planning schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A wind-to-ammonia project being proposed in Central Newfoundland could see up to 1,000 construction and 500 full-time jobs if its full capacity is reached. The proponents say the initial phase would amount to 1,000 megawatts of power produced by roughly 200 medium-sized turbines, but the potential is there for 3,000 megawatts.

Budget

Location

Country

Canada

State

NF

City

Botwood

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Wind, Power Generation (CCGT), Hydrogen, Commercial

Article published date

2025-03-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project