Botwood Wind to Ammonia Development
Sector: Wind • Location: Botwood, NF, Canada
Source: Dodge
A wind-to-ammonia project being proposed in Central Newfoundland could see up to 1,000 construction and 500 full-time jobs if its full capacity is reached. The proponents say the initial phase would amount to 1,000 megawatts of power produced by roughly 200 medium-sized turbines, but the potential is there for 3,000 megawatts.
- Status
- Prospective
- Sector
- Wind, Power Generation (CCGT), Hydrogen, Commercial
- Location
- Botwood, NF, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Botwood Wind to Ammonia Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A wind-to-ammonia project being proposed in Central Newfoundland could see up to 1,000 construction and 500 full-time jobs if its full capacity is reached. The proponents say the initial phase would amount to 1,000 megawatts of power produced by roughly 200 medium-sized turbines, but the potential is there for 3,000 megawatts. |
Budget |
Location
Country | Canada |
State | NF |
City | Botwood |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Wind, Power Generation (CCGT), Hydrogen, Commercial |
Article published date | 2025-03-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
