logo

Bouctouche Lagoon Upgrades

Sector: Waste Processing and Treatment • Location: New Brunswick, Canada

Source: Infrastructure Canada

Project
Completed

The Town of Bouctouche is currently seeking to upgrade its wastewater treatment system, also known as its municipal lagoon. Given the steadily aging infrastructure (the lagoon was built in 1976 with upgrades in 1990), major upgrades are required to ensure effective wastewater treatment. In the past few years, the impacts of climate change have been felt on the lagoon. The increase in heavy precipi

Status
Closed
Sector
Waste Processing and Treatment, Water Supply and Storage, Government
Location
New Brunswick, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Bouctouche Lagoon Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Bouctouche Lagoon Upgrades” is an infrastructure initiative in the Waste Processing and Treatment sector, located in New Brunswick, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Town of Bouctouche is currently seeking to upgrade its wastewater treatment system, also known as its municipal lagoon. Given the steadily aging infrastructure (the lagoon was built in 1976 with upgrades in 1990), major upgrades are required to ensure effective wastewater treatment. In the past few years, the impacts of climate change have been felt on the lagoon. The increase in heavy precipitation, the accelerated melting of snow in the spring and the many freeze-thaw cycles in the winter affect the lagoon’s operations. More often now than before, weather events are being seen to affect the lagoon, and the water level in the lagoon exceeds the values prescribed in the design standards for this type of treatment system. In the long term, if this situation is not corrected, stability risks and hazard risks for the operation will need to be anticipated. Although the proposed upgrades consist of an upgrading of the lagoon’s major components (new aeration system for both cells, installation of a new impermeable membrane, installation of a floating curtain to increase retention time, and the upgrading of equipment for controlling floating material and particulates to improve pre-treatment), it is also proposed that the height of the dikes be increased in order to increase the efficacy of the treatment and mitigate the risks associated with climate change.

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

New Brunswick

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Water Supply and Storage, Government

Article published date

2026-05-31

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project