logo

Boulder JCC Solar Panel Expansion

Sector: Solar • Location: Boulder, Colorado, United States of America

Source: Dodge

Project
Start

The Boulder JCC is expanding its renewable energy infrastructure by adding 306 kW of solar panels to the roof of their building, complementing the existing 80 kW system. The project aims to produce approximately 80% of the JCC's annual electricity needs upon completion.

Status
Prospective
Sector
Solar, Power Transmission, Power Generation (CCGT), Commercial
Location
Boulder, Colorado, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Boulder JCC Solar Panel Expansion

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Boulder JCC Solar Panel Expansion” is an infrastructure initiative in the Solar sector, located in Boulder, Colorado, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

start

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Boulder JCC is expanding its renewable energy infrastructure by adding 306 kW of solar panels to the roof of their building, complementing the existing 80 kW system. The project aims to produce approximately 80% of the JCC's annual electricity needs upon completion.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Colorado

City

Boulder

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Solar, Power Transmission, Power Generation (CCGT), Commercial

Article published date

2025-10-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project