logo

Boulder Solar III and Dry Lake East Solar Projects

Sector: Solar • Location: Boulder City, Nevada, United States

Source: Las Vegas Review-Journal

Project
Delayed

Two solar projects in Southern Nevada, Boulder Solar III in Boulder City's Eldorado Valley and Dry Lake East about 20 miles northeast of Las Vegas, are pending and expected to become operational by June 2027 and the end of 2026 respectively. These projects are affected by a July 15 memo requiring direct approval from the Interior Secretary for every step of solar and wind development on public lan

Status
Failure
Sector
Solar, Power Generation (CCGT), Wind, Government
Location
Boulder City, Nevada, United States of America
Updated
22 Jul 2026
Source
Las Vegas Review-Journal

ConstructChat

Ask ConstructChat about Boulder Solar III and Dry Lake East Solar Projects

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Boulder Solar III and Dry Lake East Solar Projects” is an infrastructure initiative in the Solar sector, located in Boulder City, Nevada, United States. Taiyo aggregates data on it from Las Vegas Review-Journal.

Participants

Not available for this record.

Status

Original status

delayed

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Two solar projects in Southern Nevada, Boulder Solar III in Boulder City's Eldorado Valley and Dry Lake East about 20 miles northeast of Las Vegas, are pending and expected to become operational by June 2027 and the end of 2026 respectively. These projects are affected by a July 15 memo requiring direct approval from the Interior Secretary for every step of solar and wind development on public land, causing delays and freezing projects deep in the pipeline.

Original sector

Energy

Location

Country

United States of America (USA)

State

Nevada

City

Boulder City

Source

Source

Las Vegas Review-Journal

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT), Wind, Government

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project