logo

Boulder Solar III Project

Sector: Power Generation (CCGT) • Location: Nevada, United States

Source: Energy-Storage.News

Project
Planned

The Boulder Solar III project comprises 127.9MW of solar and storage, with a PPA scheduled to reach commercial operations in June 2027.

Status
Prospective
Sector
Power Generation (CCGT), Commercial, Energy Storage, Solar
Location
Nevada, United States of America
Updated
22 Jul 2026
Source
Energy-Storage.News

ConstructChat

Ask ConstructChat about Boulder Solar III Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Boulder Solar III Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Nevada, United States. Taiyo aggregates data on it from Energy-Storage.News.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Boulder Solar III project comprises 127.9MW of solar and storage, with a PPA scheduled to reach commercial operations in June 2027.

Original sector

Energy

Location

Country

United States of America (USA)

State

Nevada

Source

Source

Energy-Storage.News

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Commercial, Energy Storage, Solar

Article published date

2025-01-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project