Boulevard Modernization Phase II
One of 10,000+ projects Taiyo tracks in Virginia.
Source: Dodge
Widen and reconstruct the 4 existing thru lanes to 11' and the center turn lane to 12'. Reconstruction will include paved shoulders, curb and gutter, sidewalks, stormwater, utility relocation, traffic signals and street lighting.
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Power Transmission, Road, Power Generation (CCGT), Car parking, Automotive, Commercial, Government
- Location
- Colonial Heights, Virginia, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Boulevard Modernization Phase II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Widen and reconstruct the 4 existing thru lanes to 11' and the center turn lane to 12'. Reconstruction will include paved shoulders, curb and gutter, sidewalks, stormwater, utility relocation, traffic signals and street lighting. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Colonial Heights |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Power Transmission, Road, Power Generation (CCGT), Car parking, Automotive, Commercial, Government |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
