Boulton Insulation Warehouse
Sector: Commercial • Location: Fife, Washington, United States of America
Source: Dodge USA
The project proposes the construction of a 13,500 sf warehouse and office building together with associated site and utility improvements over the existing 0.94 acres property. Preloading of the site building pad area will be required for 3-6 months
- Status
- Prospective
- Sector
- Commercial, Warehouse, Power Transmission, Residential, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Fife, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Boulton Insulation Warehouse
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project proposes the construction of a 13,500 sf warehouse and office building together with associated site and utility improvements over the existing 0.94 acres property. Preloading of the site building pad area will be required for 3-6 months |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Fife |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Warehouse, Power Transmission, Residential, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-03-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
