logo
ProjectBid Results, Design Development

Boundary FSR Construction

Bid results, design development · British Columbia · Last reported Jun 2020

Source: Dodge USA

Robb Road West- New Construction of 2.7 kms of FSR Gloucester- New Construction (all phases) of 3.2 kms of the Union 2200 FSR. Plus, new installation of 9 meter portable bridge on Dane Creek. (at approximately 2.8 km on the Union 2200 FSR) a classified fish stream. This includes providing timbers, lock blocks and all attachment hardware. Bridge to be provided by BCTS at Kettle Valley Yard, approx.

Status
Closed
Sector
Forest Products and Packaging, Bridge, Road, Commercial
Location
Rock Creek, British Columbia, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Boundary FSR Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Boundary FSR Construction” is an infrastructure initiative in the Forest Products and Packaging sector, located in Rock Creek, British Columbia, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results, Design Development

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Robb Road West- New Construction of 2.7 kms of FSR Gloucester- New Construction (all phases) of 3.2 kms of the Union 2200 FSR. Plus, new installation of 9 meter portable bridge on Dane Creek. (at approximately 2.8 km on the Union 2200 FSR) a classified fish stream. This includes providing timbers, lock blocks and all attachment hardware. Bridge to be provided by BCTS at Kettle Valley Yard, approx. 5 kms east of Rock Creek, BC. Pass 20000- New Construction of 1.7 kms of FSR Oulette- New Constr...

Procurement method

Location

Country

Canada

State

British Columbia

City

Rock Creek

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Forest Products and Packaging, Bridge, Road, Commercial

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project