Boundary-Rafferty Control Upgrades
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Construction Supervision of Upgrades to Boundary-Rafferty Control Structure Synopsis: WSA owns and operates the Boundary-Rafferty control structure and associated diversion canal. This 10.9 kilometer, 60 m 3 /s maximum flow diversion canal was constructed as part of the Rafferty Dam development in the 1990s and runs from Boundary Reservoir to Rafferty Reservoir. This canal affords the ability to d
- Status
- Prospective
- Sector
- Water Supply and Storage, Hydro, Government, Commercial, Residential, Waste Processing and Treatment
- Location
- Estevan, Saskatchewan, Canada
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Boundary-Rafferty Control Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Construction Supervision of Upgrades to Boundary-Rafferty Control Structure Synopsis: WSA owns and operates the Boundary-Rafferty control structure and associated diversion canal. This 10.9 kilometer, 60 m 3 /s maximum flow diversion canal was constructed as part of the Rafferty Dam development in the 1990s and runs from Boundary Reservoir to Rafferty Reservoir. This canal affords the ability to divert surplus flows in Long Creek which cannot be stored in the Boundary Reservoir to the Raffert... |
Procurement method | |
Budget |
Location
Country | Canada |
State | Saskatchewan |
City | Estevan |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Hydro, Government, Commercial, Residential, Waste Processing and Treatment |
Article published date | 2024-08-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
