Boundary-Smith Creek WMA Water Control Structures
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Boundary-Smith Creek Wildlife Management Area Water Control Structure Replacement (#8, 12, & 13) The project is located at the Boundary-Smith Creek WMA, approximately 28 miles northwest of Bonners Ferry, Boundary County, Idaho. It consists of removing and disposing of three (3) round, corrugated-metal water control structures and replacing them with rectangular, precast concrete structures. Deep e
- Status
- Closed
- Sector
- Metal, Cement, Water Supply and Storage, Waste Processing and Treatment, Commercial
- Location
- Boise, Idaho, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Boundary-Smith Creek WMA Water Control Structures
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Boundary-Smith Creek Wildlife Management Area Water Control Structure Replacement (#8, 12, & 13) The project is located at the Boundary-Smith Creek WMA, approximately 28 miles northwest of Bonners Ferry, Boundary County, Idaho. It consists of removing and disposing of three (3) round, corrugated-metal water control structures and replacing them with rectangular, precast concrete structures. Deep excavations and shoring are anticipated, and ground water is likely to be encountered. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Idaho |
City | Boise |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Cement, Water Supply and Storage, Waste Processing and Treatment, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
