logo

BOWEN ROAD @ SANDY MOUNT CREEK 3 MI NE OF VIENNA

Sector: Bridge • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

The proposed project will replace the existing bridge along Bowen Road over Sandy Mount Creek (Structure ID 093-5025-0) in Dooly County, Georgia. The bridge was constructed in 1932 and widened in 1973. It has posted load restrictions and is recommended for replacement.

The existing roadway consists of a 10-foot lane in each direction with an existing bridge length of 72-feet. The propose

Status
Under Construction
Sector
Bridge, Road
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about BOWEN ROAD @ SANDY MOUNT CREEK 3 MI NE OF VIENNA

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “BOWEN ROAD @ SANDY MOUNT CREEK 3 MI NE OF VIENNA” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Not available for this record.

Status

Original status

construction work program

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed project will replace the existing bridge along Bowen Road over Sandy Mount Creek (Structure ID 093-5025-0) in Dooly County, Georgia. The bridge was constructed in 1932 and widened in 1973. It has posted load restrictions and is recommended for replacement. The existing roadway consists of a 10-foot lane in each direction with an existing bridge length of 72-feet. The proposed typical roadway section will consist of an 11-foot lane with a 6-foot rural shoulder (2-foot paved) in each direction. The proposed typical bridge section will consist of an 11-foot lane with a 2-foot shoulder in each direction. Exact proposed roadway and bridge measurements are unknown at this time and will be updated as the project advances. An off-site detour of 2.7 miles will result in a net-length travel increase of 1.2 miles. This project will require additional ROW and easements, but areas have not been determined.

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Bridge, Road

Article published date

2026-04-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project