Box Culvert Replacement
Sector: Water Supply and Storage • Location: Dakota City, Iowa, United States of America
Source: Dodge USA
Box Culvert Replacement involving the following Quantities 1. Removal of Existing Bridge .Lump Sum 2. Excavation, Class 20 . 338 C.Y. 3. Excavation, Class 24 1034 C.Y. 4. Precast Concrete Box Culvert, 10x10 60 L.F. 5. Precast Concrete Box Culvert Str End Section 10x10 Each 6. Culvert, CMP 15 Dia. 260 L.F. 7. Engineering Fabric 68 S.Y. 8. Revetment, Class E RipRap50 Ton 9. Mobilization. Lump Sum, 2
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Box Culvert Replacement involving the following Quantities 1. Removal of Existing Bridge .Lump Sum 2. Excavation, Class 20 . 338 C.Y. 3. Excavation, Class 24 1034 C.Y. 4. Precast Concrete Box Culvert, 10x10 60 L.F. 5. Precast Concrete Box Culvert Str End Section 10x10 Each 6. Culvert, CMP 15 Dia. 260 L.F. 7. Engineering Fabric 68 S.Y. 8. Revetment, Class E RipRap50 Ton 9. Mobilization. Lump Sum, 20 April 8, 2024 Board of Supervisors of Humboldt County |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
