logo
ProjectStart

Box Culvert Replacement

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

construction will begin on 2 box culverts northeast of Lincoln. The projects are located on 2400th Street and on 2250 Boulevard approximately two miles southeast of Union and 4 miles west of Atlanta. Both roads will be closed to traffic during construction, which will last until late October. The existing structures are in poor condition. Replacement of an existing box culvert with a new concrete

Status
Prospective
Sector
Water Supply and Storage, Cement, Government, Road, Waste Processing and Treatment, Commercial
Location
Union, Illinois, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Box Culvert Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Box Culvert Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Union, Illinois, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

start

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

construction will begin on 2 box culverts northeast of Lincoln. The projects are located on 2400th Street and on 2250 Boulevard approximately two miles southeast of Union and 4 miles west of Atlanta. Both roads will be closed to traffic during construction, which will last until late October. The existing structures are in poor condition. Replacement of an existing box culvert with a new concrete box culvert on 2400th Street, approximately two miles southeast of Union. Replacement of an exist...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Illinois

City

Union

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Government, Road, Waste Processing and Treatment, Commercial

Article published date

2025-09-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project