logo
ProjectPlanned

Box Elder County Data Center Project

Sector: Power Generation (CCGT) • Location: Tremonton, Utah, United States

Source: KSL.com

A proposed data center in Box Elder County, Utah, intended primarily for military needs, with a power-generating network capable of generating 7.5-9 gigawatts of power at full buildout. The project has faced public opposition and protests.

Status
Prospective
Sector
Power Generation (CCGT), Data Center
Location
Tremonton, Utah, United States of America
Updated
22 Jul 2026
Source
KSL.com

ConstructChat

Ask ConstructChat about Box Elder County Data Center Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Box Elder County Data Center Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Tremonton, Utah, United States. Taiyo aggregates data on it from KSL.com.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A proposed data center in Box Elder County, Utah, intended primarily for military needs, with a power-generating network capable of generating 7.5-9 gigawatts of power at full buildout. The project has faced public opposition and protests.

Original sector

Technology

Location

Country

United States of America (USA)

State

Utah

City

Tremonton

Source

Source

KSL.com

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Data Center

Article published date

2026-05-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project