logo

Box Elder County Large-Scale Data Center Project

Sector: Energy Storage • Location: Box Elder County, Utah, United States

Source: ABC4 Utah

Project
Planned

A proposed large-scale data center project in a rural area south of US-84 in Box Elder County, Utah, presented by Kevin O'Leary's venture firm O'Leary Digital to Utah’s Military Installation Development Authority. The project aims to utilize advanced environmental technologies including air-cooled turbines, solar, wind, and battery power to address concerns about air, water use, heat, noise, and p

Status
Prospective
Sector
Energy Storage, Wind, Power Generation (CCGT), Water Supply and Storage, Solar, Data Center
Location
Box Elder County, Utah, United States of America
Updated
22 Jul 2026
Source
ABC4 Utah

ConstructChat

Ask ConstructChat about Box Elder County Large-Scale Data Center Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Box Elder County Large-Scale Data Center Project” is an infrastructure initiative in the Energy Storage sector, located in Box Elder County, Utah, United States. Taiyo aggregates data on it from ABC4 Utah.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A proposed large-scale data center project in a rural area south of US-84 in Box Elder County, Utah, presented by Kevin O'Leary's venture firm O'Leary Digital to Utah’s Military Installation Development Authority. The project aims to utilize advanced environmental technologies including air-cooled turbines, solar, wind, and battery power to address concerns about air, water use, heat, noise, and pollution.

Original sector

Technology

Location

Country

United States of America (USA)

State

Utah

City

Box Elder County

Source

Source

ABC4 Utah

URL

More Details

Record type

Project

Sector

Energy Storage, Wind, Power Generation (CCGT), Water Supply and Storage, Solar, Data Center

Article published date

2026-05-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project