Boyabat Hydroelectric Power

Sector: Hydro • Location: Turkey

Source: World Bank Group

Project
Active

Boyabat Elektrik Uretim ve Ticaret Ltd Sirketi was created to build and operate 510 MW Boyabat Hydroelectric Plant on Kizilimak river in Boyabat, Turkey. The project company was owned by Unit Investment N.V. (33%), Dogus Holding (33%) and Dogan Group (33%). When completed, this will be the largest hydroelectric plant in Turkey to be owned by the private sector. The project would be developed with

Project Information FAQ

Project Information

4 Q
The project “Boyabat Hydroelectric Power” is an infrastructure initiative in the Hydro sector, located in Turkey. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Boyabat Elektrik Uretim ve Ticaret Ltd Sirketi was created to build and operate 510 MW Boyabat Hydroelectric Plant on Kizilimak river in Boyabat, Turkey. The project company was owned by Unit Investment N.V. (33%), Dogus Holding (33%) and Dogan Group (33%). When completed, this will be the largest hydroelectric plant in Turkey to be owned by the private sector. The project would be developed without any government guarantee and electricity sales would be done in the liberalized electricity market. The project cost was estimated to be US$1,214 million. The project reached financial closure on January 15 2010. The total project cost was US$1.15 billion, of which US$464 million was equity and US$750 million was debt. The US$464 million in equity was provided equally by the three project sponsors. The US$750 million loan, which had a 12 year tenor, was provided by Garanti Bank (27.5%), Yapi Kredi (27.5%), Isbank (25%) and TSKB 20%. The pricing on the 12-year debt is around 500bp over Libor door-to-door, not including arranger fees. Construction of the project began in Apr 2008 with a bridge loan from Garanti Bank, Yapi Kredi and TSKB. Dogus Insaat is the engineering, procurement and construction (EPC) contractor. The project was scheduled to begin operations in Nov 2012.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data