Boyne River Bridge Replacement
Sector: Bridge • Location: Ontario, Canada
Source: Dodge USA
consulting engineering services to rehabilitate or replace the Boyne River Bridge on County Road 10, approximately 75m north of Highway 89, in the Township of New Tecumseth. The existing bridge is a three-span reinforced concrete slab on precast concrete girders which measures approximately 21.2m in each of the span for a total span length of 63.6m
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | consulting engineering services to rehabilitate or replace the Boyne River Bridge on County Road 10, approximately 75m north of Highway 89, in the Township of New Tecumseth. The existing bridge is a three-span reinforced concrete slab on precast concrete girders which measures approximately 21.2m in each of the span for a total span length of 63.6m |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
