Boyne River Bridge Replacement
Closed · Ontario · Last reported Jan 2023
Source: Dodge USA
consulting engineering services to rehabilitate or replace the Boyne River Bridge on County Road 10, approximately 75m north of Highway 89, in the Township of New Tecumseth. The existing bridge is a three-span reinforced concrete slab on precast concrete girders which measures approximately 21.2m in each of the span for a total span length of 63.6m
- Status
- Closed
- Sector
- Bridge, Cement, Road, Government, Commercial
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Boyne River Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | consulting engineering services to rehabilitate or replace the Boyne River Bridge on County Road 10, approximately 75m north of Highway 89, in the Township of New Tecumseth. The existing bridge is a three-span reinforced concrete slab on precast concrete girders which measures approximately 21.2m in each of the span for a total span length of 63.6m |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Ontario |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Bridge, Cement, Road, Government, Commercial |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in Canada
- Aqsarniit Hotel and Convention Centre
- Toronto Airport Piers D and E Fixed Bridges
- British Columbia Swartz Bay and Tsawwassen Ferry Terminals
- Viva Magnetics Plant
- Sheffield Bridge Tri-Municipal Project
- Nisichawayasihk Cree Nation (NCN) Road Paving Project Phase 2
- Rosenort Industrial Park Road Extension
- Paving of Oak River Roads
