logo

Boynton Bridge Replacement Project

Sector: Bridge • Location: Boynton, Pennsylvania, United States

Source: Daily American

Project
Under Construction

The project involves the permanent replacement of the Boynton Bridge over Piney Creek. A temporary bridge will be realigned to keep Route 219 open during construction, while the permanent bridge is built on the direct alignment with Route 219.

Status
Under Construction
Sector
Bridge, Road
Location
Boynton, Pennsylvania, United States of America
Updated
22 Jul 2026
Source
Daily American

ConstructChat

Ask ConstructChat about Boynton Bridge Replacement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Boynton Bridge Replacement Project” is an infrastructure initiative in the Bridge sector, located in Boynton, Pennsylvania, United States. Taiyo aggregates data on it from Daily American.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the permanent replacement of the Boynton Bridge over Piney Creek. A temporary bridge will be realigned to keep Route 219 open during construction, while the permanent bridge is built on the direct alignment with Route 219.

Original sector

Transportation

Budget

Location

Country

United States of America (USA)

State

Pennsylvania

City

Boynton

Source

Source

Daily American

URL

More Details

Record type

Project

Sector

Bridge, Road

Article published date

2026-05-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project