Boys And Girls Club Lime St. Renovation Addition REBID
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
294 SF New Vestibule, Storage and Elevator Shaft expansion on the main level - 3,076 SF Renovation of the Main level - The Renovation and addition will include a new elevator - BGCCV Lime Street Zone 1 and 1A Renovation includes the following Work: Sitework, concrete work, metal stud framing, finish carpentry, casework, insulation, EPDM roofing, sheet metal work, sealants, steel doors, wood doors,
- Status
- Closed
- Sector
- Commercial, Manufacturing (Industrial), Road, Metal, Cement, Steel
- Location
- Waterloo, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Boys And Girls Club Lime St. Renovation Addition REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 294 SF New Vestibule, Storage and Elevator Shaft expansion on the main level - 3,076 SF Renovation of the Main level - The Renovation and addition will include a new elevator - BGCCV Lime Street Zone 1 and 1A Renovation includes the following Work: Sitework, concrete work, metal stud framing, finish carpentry, casework, insulation, EPDM roofing, sheet metal work, sealants, steel doors, wood doors, metal frames, storefront, aluminum doors, glass, hardware, flooring, walls, and ceiling finishes... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Waterloo |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Commercial, Manufacturing (Industrial), Road, Metal, Cement, Steel |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
