bp Cherry Point Refinery Crude Unit
Sector: Commercial • Location: Blaine, Washington, United States of America
Source: Dodge USA
The scope includes construction of a new stick-built steel DCS building with raised floor (approximately 1,354 square feet) on a new concrete foundation, and construction of associated stairs (2) and access platforms (2) for the building. The DCS building will be a single-story non-occupied structure. Project scope also includes installation of new cable trays and existing pipe rack steel/foundati
- Status
- Prospective
- Sector
- Commercial, Warehouse, Cement, Oil and Gas, Power Transmission, Steel, Telecommunications, Metal, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Blaine, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about bp Cherry Point Refinery Crude Unit
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope includes construction of a new stick-built steel DCS building with raised floor (approximately 1,354 square feet) on a new concrete foundation, and construction of associated stairs (2) and access platforms (2) for the building. The DCS building will be a single-story non-occupied structure. Project scope also includes installation of new cable trays and existing pipe rack steel/foundation modifications, utility duct bank excavation for tie-ins, equipment pad, and associated grading... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Blaine |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Warehouse, Cement, Oil and Gas, Power Transmission, Steel, Telecommunications, Metal, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
