bp pulse EV Fast Charging Site in Eloy, Arizona
Sector: Electric Vehicles (EVs) • Location: Eloy, Arizona, United States
Source: Charged EVs
bp pulse opened its first EV fast charging site in Arizona at a Petro Travel Center just off I-10 near Eloy. The site features 16 charging bays with 400 kW chargers, and amenities including a travel store, on-site diner, ATM, and barber shop.
- Status
- Closed
- Sector
- Electric Vehicles (EVs), Automotive, Residential, Commercial
- Location
- Eloy, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Charged EVs
ConstructChat
Ask ConstructChat about bp pulse EV Fast Charging Site in Eloy, Arizona
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | bp pulse opened its first EV fast charging site in Arizona at a Petro Travel Center just off I-10 near Eloy. The site features 16 charging bays with 400 kW chargers, and amenities including a travel store, on-site diner, ATM, and barber shop. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Arizona |
City | Eloy |
Source
Source | Charged EVs |
URL |
More Details
Record type | Project |
Sector | Electric Vehicles (EVs), Automotive, Residential, Commercial |
Article published date | 2025-12-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Electric Vehicles (EVs) projects in United States
- Silver Line Gateway Project, Massachusetts
- Arranta’s New Commercial-Ready Manufacturing Facility, Watertown, Massachusetts
- Upsher-Smiths’ Pharmaceutical Manufacturing Facility, Minnesota, USA
- Baldock Solar Highway
- Promega Corporation’s Manufacturing Facility, Wisconsin
- New Orleans BioInnovation Center
- MSU Grand Rapids Research Centre, Michigan, USA
- Park Avenue Park and Ride Garage
