logo
ProjectPending

BPC Distribution

Sector: Road • Location: Bhutan

Source: IFC Project Disclosures

IFC proposes to provide a debt investment of US$20 million to Bhutan Power Corporation (BPC). BPC is a state-owned company in Bhutan, responsible for the transmission and distribution of electricity across the country. It is wholly owned by Druk Holding and Investments Limited (‘DHI’), the investment arm of the Royal Government of Bhutan, which operates on commercial principles. The investment wil

Status
Prospective
Sector
Road, Government, Solar, Power Generation (CCGT), Commercial
Location
Bhutan
Updated
19 Nov 2026
Source
IFC Project Disclosures

ConstructChat

Ask ConstructChat about BPC Distribution

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “BPC Distribution” is an infrastructure initiative in the Road sector, located in Bhutan. Taiyo aggregates data on it from IFC Project Disclosures.

Participants

Not available for this record.

Status

Original status

pending

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

IFC proposes to provide a debt investment of US$20 million to Bhutan Power Corporation (BPC). BPC is a state-owned company in Bhutan, responsible for the transmission and distribution of electricity across the country. It is wholly owned by Druk Holding and Investments Limited (‘DHI’), the investment arm of the Royal Government of Bhutan, which operates on commercial principles. The investment will be utilized for: (a) upgradation of Thimphu transmission system, including upgradation of 220/66kV Semtokha Air Insulated Substation (AIS) to Gas Insulated Substation (GIS); and (b) integration of upcoming solar power generation capacity including construction of 220/33kV Tenchekha Pooling Substation (PS). The conversion of AIS to GIS at Semtokha is expected to happen concurrently with decommissioning of the existing transformer at the existing substation (SS) site. The GIS SS will be compact (18 X 21 sqmt) and therefore require limited space within existing SS premises. The conversion will involve replacement of transformers and associated equipment like circuit breakers, lightning arrestor, bus bar, control panel, relay panel and insulator. The current outgoing peak load is 128 MW, which during the conversion of the AIS to GIS will be managed through Bhutan Power System Operator, including the Load Dispatch Centre, in accordance with the power system contingency plan to ensure effective peak load management from the substation. The overall timeline for completion of the process is approximately six months and will involve two separate contractors: one for civil work and another for the GIS installation. The GIS supplier will be responsible for transporting the GIS from India via the Phuentsholing border and installing it at the site. The GIS configuration has been selected based on the load-bearing capacity of the roads along the transportation route. The typical service life of a transformer is approximately 30 years; as the existing transformer is around 18 years old, it will be relocated to another substation for continued use.BPC is an existing client of IFC. Information on the existing investment through BPC Transmission # 48965, committed in Sep 2025 is available at  HYPERLINK "https://disclosures.ifc.org/project-detail/SII/48965/bpc-transmission" https://disclosures.ifc.org/project-detail/SII/48965/bpc-transmission; and performance till date is satisfactory.

Original sector

V-DA - Electric Power Transmission

Location

Country

Bhutan

Source

Source

IFC Project Disclosures

URL

More Details

Record type

Project

Sector

Road, Government, Solar, Power Generation (CCGT), Commercial

Article published date

2026-09-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project