logo
ProjectActive

BPC Transmission

One of 6,123 projects Taiyo tracks in Bhutan.

Source: International Finance Corporation (IFC)

 IFC proposes to provide a corporate loan of US$20 million to Bhutan Power Corporation Limited (‘BPC’ or the ‘Company’) for the construction of a 132/33kV gas-insulated substation (GIS) at Lungjong in Panbang in Zhemgang district and the modernization of the distribution system (the ‘Project’). BPC is a state-owned company in Bhutan, responsible for the transmission and distribution of electricity

Status
Prospective
Sector
Water Supply and Storage, Steel, Raw Materials, Power Generation (CCGT), Residential, Commercial, Government
Location
Bhutan
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about BPC Transmission

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “BPC Transmission” is an infrastructure initiative in the Water Supply and Storage sector, located in Bhutan. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

IFC proposes to provide a corporate loan of US$20 million to Bhutan Power Corporation Limited (‘BPC’ or the ‘Company’) for the construction of a 132/33kV gas-insulated substation (GIS) at Lungjong in Panbang in Zhemgang district and the modernization of the distribution system (the ‘Project’). BPC is a state-owned company in Bhutan, responsible for the transmission and distribution of electricity across the country. It is wholly owned by Druk Holding and Investments Limited (‘DHI’), the investment arm of the Royal Government of Bhutan, which operates on commercial principles. The investment will be utilized for: (a) construction of 132/33kV GIS in Panbang and a 0.7 km Loop In Loop Out line to the existing 132kV Tingtibi - Nganglam transmission line, with an expected project cost of US$ 5.1 million; and (b) establishment of 4 regional Distribution Control Centers (DCCs) in Phuentsholing, Mongar, S/jongkhar and Gelephu, and upgradation of the central DCC in Thimphu and integration of all regional DCCs to the central DCC, with a total expected cost of US$16.8 million. The regional DCCs will be established within existing operational assets of BPC (substations) and will not involve any new land acquisition or additional footprint.There is no involuntary land acquisition involved with the project. For the construction of the Panbang substation, 0.9 acres of private land was obtained from a single landowner through a willing buyer-willing seller approach. The landowner was provided substitute land with a similar landuse profile.

Original sector

V-DA - Electric Power Transmission

Location

Country

Bhutan

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Steel, Raw Materials, Power Generation (CCGT), Residential, Commercial, Government

Article published date

2026-01-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project