BPC Transmission
Sector: Water Supply and Storage • Location: Bhutan
Source: International Finance Corporation (IFC)
IFC proposes to provide a corporate loan of US$20 million to Bhutan Power Corporation Limited (‘BPC’ or the ‘Company’) for the construction of a 132/33kV gas-insulated substation (GIS) at Lungjong in Panbang in Zhemgang district and the modernization of the distribution system (the ‘Project’). BPC is a state-owned company in Bhutan, responsible for the transmission and distribution of electricity
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | pending |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | IFC proposes to provide a corporate loan of US$20 million to Bhutan Power Corporation Limited (‘BPC’ or the ‘Company’) for the construction of a 132/33kV gas-insulated substation (GIS) at Lungjong in Panbang in Zhemgang district and the modernization of the distribution system (the ‘Project’). BPC is a state-owned company in Bhutan, responsible for the transmission and distribution of electricity across the country. It is wholly owned by Druk Holding and Investments Limited (‘DHI’), the investment arm of the Royal Government of Bhutan, which operates on commercial principles. The investment will be utilized for: (a) construction of 132/33kV GIS in Panbang and a 0.7 km Loop In Loop Out line to the existing 132kV Tingtibi - Nganglam transmission line, with an expected project cost of US$ 5.1 million; and (b) establishment of 4 regional Distribution Control Centers (DCCs) in Phuentsholing, Mongar, S/jongkhar and Gelephu, and upgradation of the central DCC in Thimphu and integration of all regional DCCs to the central DCC, with a total expected cost of US$16.8 million. The regional DCCs will be established within existing operational assets of BPC (substations) and will not involve any new land acquisition or additional footprint.There is no involuntary land acquisition involved with the project. For the construction of the Panbang substation, 0.9 acres of private land was obtained from a single landowner through a willing buyer-willing seller approach. The landowner was provided substitute land with a similar landuse profile. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
