logo

BPCL LPG Pipeline from Kochi to Erode and Salem via Coimbatore

Sector: Commercial • Location: Ernakulam, Kerala, India

Source: India Investment Grid (IIG)

Project
Closed

Information Bharat Petroleum Corporation Limited [BPCL] has come up with BPCL LPG Pipeline from Kochi to Erode and Salem via Coimbatore with a ticket size of 1507.24 INR Crores. This project in Bulk Material Transportation Pipelines sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project The pro

Project Information FAQ

Project Information

5 Q
The project “BPCL LPG Pipeline from Kochi to Erode and Salem via Coimbatore” is an infrastructure initiative in the Commercial sector, located in Ernakulam, Kerala, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information Bharat Petroleum Corporation Limited [BPCL] has come up with BPCL LPG Pipeline from Kochi to Erode and Salem via Coimbatore with a ticket size of 1507.24 INR Crores. This project in Bulk Material Transportation Pipelines sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project The project involves laying, building and, operation of approx. 449 Km LPG Pipeline from Kochi to Erode and Salem via Coimbatore [with supply from Puthuvypeen LPG facility and Kochi refinery]. The project is being executed by KSPPL [Kochi Salem Pipeline Pvt Ltd] which is a JV between BPCL & IOCL with 50-50 participation each. The PNGRB authorization of project was obtained on 26/02/2014 which is now extended up to 28/02/2023 [Kerala portion] and 28/02/2025 [Tamil Nadu portion]. The pipeline will help decongest roads by taking away many bullet gas tankers [300/day approx.] off the national highway between Kochi and the northern- eastern destinations. The gas pipeline will link the bottling plants at Udayamperoor, Palakkad and two plants at Coimbatore and Erode, operated both by BPCL and IOC. This will help the transportation of LPG by road to these bottling plants. Physical Progress reported is for Kerala Portion.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data