BPCL Refinery Project
Sector: Oil and Gas • Location: Andhra Pradesh, India
Source: India.Com
BPCL is preparing a report for its refinery-cum-petrochemical factory in Andhra Pradesh, which would have an annual capacity of 9-12 million tonnes and will be built at a cost of around Rs 95,000 crore. Aramco is likely to spend Rs 9,000 crore for a 26% equity stake in the project.
- Status
- Prospective
- Sector
- Oil and Gas, Chemical (Industrial), Manufacturing (Industrial)
- Location
- Andhra Pradesh, India
- Updated
- 22 Jul 2026
- Source
- India.Com
ConstructChat
Ask ConstructChat about BPCL Refinery Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | BPCL is preparing a report for its refinery-cum-petrochemical factory in Andhra Pradesh, which would have an annual capacity of 9-12 million tonnes and will be built at a cost of around Rs 95,000 crore. Aramco is likely to spend Rs 9,000 crore for a 26% equity stake in the project. |
Budget |
Location
Country | India |
State | Andhra Pradesh |
Source
Source | India.Com |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, Chemical (Industrial), Manufacturing (Industrial) |
Article published date | 2025-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
