logo

BR 040 - 116 - 381 Toll Road

Sector: Steel • Location: Brazil

Source: World Bank Group

Project
Active

In December 2013, Invepar, a partnership of the Brazilian construction company OAS (25%) and three Brazilian pension funds (Banco do Brasil PREVI, Caixa Economica Federal FUNCEFand Petrobras Petros, each with 25% of the shares), won in a competitive bidding the right to expand, rehabilitate and operate the 936.8 km of highway BR-040 connecting the cities of Brasilia and Rio de Janeiro.

The biddi

Project Information FAQ

Project Information

5 Q
The project “BR 040 - 116 - 381 Toll Road” is an infrastructure initiative in the Steel sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In December 2013, Invepar, a partnership of the Brazilian construction company OAS (25%) and three Brazilian pension funds (Banco do Brasil PREVI, Caixa Economica Federal FUNCEFand Petrobras Petros, each with 25% of the shares), won in a competitive bidding the right to expand, rehabilitate and operate the 936.8 km of highway BR-040 connecting the cities of Brasilia and Rio de Janeiro. The bidding criteria was the lowest tariff, and Invepar offered toll rates that were 61.13% below the ceiling set by the federal government. Seven other groups took part in the bidding process: Consórcio Via Capital (Ecorodovias Infraestrutura e Logistica s.a., Coimex Empreedimentos e Participacoes Ltda., Rio Novo Locacoes Ltda; Tervap Pitanga Mineracao e Pavimentacao Ltda; Contek Engenharia S.A.; A. Madeira Industria e Comercio Ltda; Urbesa Administracao Ltda); Companhia de Participacoes em Concessoes (CPC/CCR); TPI – Triunfo Participacoes e Investimentos; Queiroz Galvao Infraestrutura; Consorcio Caminho Novo (Encalso Construcoes Ltda; Camter Construcoes e Empreendimentos S/A; Infravix participacoes S/A; Conter Construcoes e Comercio S/A; Firpavi Construtora e Pavimentadora S/A ); Consorcio Integracao ( Fidens Engenharia S.A.; Construtora Aterpa M. Martins S.A.; Construtora ); and Contern Construções e Comércio Ltda. The 30-year concession contract was signed in March 2014. The sponsors created the company Concessionaria BR-040 S.A. (Via 040) to lead the project. Operations commenced in April 2014. The investment was estimated at US$ 3369 million (BRL 7.92 billion) over the life of the project. In September 2014, the state-owned bank BNDES approved a US$ 410.8 million (BRL 965.7 million) loan finance the investment costs in the first two years of the project. The project was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data