logo

BR-153/414/080 toll road concession

Sector: Road • Location: Brazil

Source: World Bank Group

Project
Active

This project involves the concession of BR-153/414/080 toll road, located in the states of Goias and Tocantins, Brazil. EcoRodovias won the project at auction in April 2021 and signed the 35-year concession contract in October 2021. Concessionaire Ecovias do Araguaia is the SPV, which is owned by EcoRodovias (65%) and GLP (35%). The PPP covers 851km of federal highways between Aliança do Tocantins

Project Information FAQ

Project Information

4 Q
The project “BR-153/414/080 toll road concession” is an infrastructure initiative in the Road sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project involves the concession of BR-153/414/080 toll road, located in the states of Goias and Tocantins, Brazil. EcoRodovias won the project at auction in April 2021 and signed the 35-year concession contract in October 2021. Concessionaire Ecovias do Araguaia is the SPV, which is owned by EcoRodovias (65%) and GLP (35%). The PPP covers 851km of federal highways between Aliança do Tocantins and Anápolis, crossing the states of Goiás and Tocantins: BR-153 from Aliança do Tocantins to Anápolis (624.1km); BR-414 from Assunção de Goiás to Anápolis (139.6km); and BR-080 from Assunção de Goiás to Uruaçu (87km). The package includes: $584.02m (R$3.16 billion) from BNDES, priced at IPCA + 770bps and maturing in September 2051; $85.2m (R$ 461m) loan from Banco da Amazônia, priced at IPCA + 251bps and maturing in July 2046; and $110.73 (R$ 600m) of incentivised debentures, priced at IPCA + 666bps and maturing in July 2051. The debenture placement was completed on 14 July, 2022 and the credit facilities closed on 18 July, 2022. Realfin https://ri.ecorodovias.com.br/noticias/comunicado-ao-mercado-aprovacao-de-linhas-de-credito-de-longo-prazo-ecovias-do-araguaia/ https://www.ijglobal.com/articles/165862/ecorodovias-secures-highway-financing

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data