BR-364 and BR-365 highway concession
The owner, status and timeline of this project. A free account opens every field.
Source: InfraPPPWorld
The project comprises a total length of 437 km, including the BR-364/GO/MG stretch between the junction with BR-060 (A) (Jataí) until the junction with BR-153(A)/262(A) (Comendador Gomes).The highway includes all elements that integrate its domain, including access points and loops, buildings and terrain, lanes, hard shoulder, works of art and any other elements, as well as the areas occupied by o
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Government
- Location
- Goias - Minas Gerais, Brazil
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about BR-364 and BR-365 highway concession
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | project awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project comprises a total length of 437 km, including the BR-364/GO/MG stretch between the junction with BR-060 (A) (Jataí) until the junction with BR-153(A)/262(A) (Comendador Gomes).The highway includes all elements that integrate its domain, including access points and loops, buildings and terrain, lanes, hard shoulder, works of art and any other elements, as well as the areas occupied by operational and administrative premises related to the Concession.The project works will include additional lanes, improvements to the roads, slopes and roundabouts in order to meet the safety and traffic conditions for the users. In addition to mandatory works, ANTT may request the possible execution of several improvements (roads, roundabouts, walkways, etc.) throughout the contract, if necessary, in the form of an inventory of improvements determined in contract. The granted portion will have 9 operational bases, of which 3 will be customer service. The bases will include ambulances, water trucks and trucks for seizure of animals.The highway will go through 11 municipalities of the State of Goiás (Aparecida do Rio Doce, Cachoeira Alta, Jataí, Paranaiguara and São Simão) and six municipalities of Minas Gerais (Santa Vitória, Gurinhatã, Ituiutuba, Canópolis, Monte Alegre de Minas and Uberlândia).The concession also includes seven toll plazas: four in Minas Gerais (Uberlandia, Monte Alegre de Minas, Ituiutaba and Santa Vitória) and three in Goiás (Paranaiguara, Cachoeira Alta and Jataí). The maximum toll fare will be BRL 7.02 (USD 1.68). The contest will win the company that offers the highest discount from this rate.The concession period is scheduled to run over 30 years. |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | Brazil |
State | Goias - Minas Gerais |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Government |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
