BR APL2 Sao Bernardo Integrated Water Management in Sao Paulo Program
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The objectives of the Integrated Water Management in Metropolitan Sao Paulo Adjustable Program Loan (APL) Program for Brazil are: (i) to protect and maintain the quality and reliability of Metropolitan Region of Sao Paulo (MRSPs) water resources and potable water sources; (ii) to improve the quality of life of the poor populations residing in key targeted urban river basins in MRSP; and (iii) to i
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Government
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about BR APL2 Sao Bernardo Integrated Water Management in Sao Paulo Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objectives of the Integrated Water Management in Metropolitan Sao Paulo Adjustable Program Loan (APL) Program for Brazil are: (i) to protect and maintain the quality and reliability of Metropolitan Region of Sao Paulo (MRSPs) water resources and potable water sources; (ii) to improve the quality of life of the poor populations residing in key targeted urban river basins in MRSP; and (iii) to improve the institutional capacity and the metropolitan management and coordination in MRSP in water resources management, water pollution control, land-use policy and basic service provision. The project has four components. (1) Institutional capacity building component is designed to support the executing agencies by strengthening their institutional capacity and promoting improved metropolitan management and coordination with regard to the key metropolitan challenges of water resources management, water pollution control, land-use policy and basic service provision. (2) Urban upgrading component is aimed at improving the standards and layouts of urban occupation in the targeted basins and improving the quality of life of the residents of these basins, especially the low-income communities living in informal settlements. (3) Environmental protection and recovery component is designed to protect and recover natural habitats and environmentally sensitive and degraded areas in the sub-basins with a view to improving environmental quality. (4) Integrated water supply and sanitation aims at reversing the main factors contributing to the pollution of the reservoirs and providing integrated water supply and sanitation services to the poor. |
Original sector | FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
