BR RJ M.TRANSIT PRJ.
Sector: Mass Transit • Location: Brazil
Source: World Bank Group
The main objectives of the Rio de Janeiro Mass Transit Project are: 1) to improve the quality of urban transport services in the metropolitan region (RJMR) by developing a fully integrated urban transport system; and 2) to substantially improve the level of service provided by the Suburban Train Company (Flumitrens) by reducing operating subsidies and increasing private sector participation in its
- Status
- Closed
- Sector
- Mass Transit, Rail, Government
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about BR RJ M.TRANSIT PRJ.
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The main objectives of the Rio de Janeiro Mass Transit Project are: 1) to improve the quality of urban transport services in the metropolitan region (RJMR) by developing a fully integrated urban transport system; and 2) to substantially improve the level of service provided by the Suburban Train Company (Flumitrens) by reducing operating subsidies and increasing private sector participation in its operations and management. The project has two components: 1) an infrastructure and equipment component that rehabilitates/refurbishes Flumitrens' rolling stock and infrastructure and rehabilitates or builds transfer stations between the trains and other modes (Metro, buses, and ferries); and 2) an institutional and policy development component that helps a) support the process of concessioning Flumitrens to the private sector through technical assistance for preparing and evaluating bids; b) operate the Regional Transport Coordination Commission (RTCC) for the RJMR; c) prepare an integrated Transport Policy, Land Use, and Air Quality Management strategy for the RJMR to meet both transport and air quality targets and to introduce sound cost recovery, tariff, regulatory, and subsidy policies; d) set up a comprehensive staff retraining for Flumitrens; e) prepare feasibility studies and bidding documents for a proposed extension and other priorities of the mass transit system; and f) implement an Environmental and Traffic subcomponent. |
Original sector | FY17 - Public Administration,FY17 - Transportation |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Rail, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
