logo

BR Sao Paulo Trains and Signalling

Sector: Mass Transit • Location: Brazil

Source: World Bank Group

Project
Closed

The development objective of the Sao Paulo Trains and Signaling Project for Brazil are to a) improve the level of service provided to the urban rail transport users in the Sao Paulo Metropolitan Region (SPMR) in a safe and cost-efficient manner by increasing the peak-hour and off-peak carrying capacity of Lines A and F of the Companhia Paulista de Trens Metropolitanos (CPTM) and Lines 1, 2, and 3

Project Information FAQ

Project Information

5 Q
The project “BR Sao Paulo Trains and Signalling” is an infrastructure initiative in the Mass Transit sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The development objective of the Sao Paulo Trains and Signaling Project for Brazil are to a) improve the level of service provided to the urban rail transport users in the Sao Paulo Metropolitan Region (SPMR) in a safe and cost-efficient manner by increasing the peak-hour and off-peak carrying capacity of Lines A and F of the Companhia Paulista de Trens Metropolitanos (CPTM) and Lines 1, 2, and 3 of the Sao Paulo Metro Company (Metro); and b) continue the strengthening of the transport management and policy framework in the SPMR. There are two components to the project. The first component is the infrastructure and equipment. This component plan to acquire (i) forty trains (Electrical Multiple Units -EMUs) of eight cars each and accessories for the CPTM; (ii) seventeen trains of 6 cars each and accessories for the Metro; (iii) signaling , telecom and electrical related equipment and associated infrastructure for the CPTM; (iv) signaling and telecom equipment and associated infrastructure for the metro. This component accounts for about 97 percent of the total project cost, of which the train acquisition alone represents about 75 percent of the total project cost. The second component is the institutional and policy development which consists of : (a) consolidation of the Regional Transport Coordination Commission (CDTI); (b) updating of the integrated transport policy, land use, and air quality management strategy Integrated Urban Transport Project (PITU) to meet both transport and air quality targets and introduce sound cost-recovery, tariff, regulatory and subsidy policies; (c) preparation of an action plan to review the funding of the urban transport system in view of the adoption of the Bilhete-Unico-Integrado (BUI); and (d) project management and supervision. This component represents about 3 percent of the total project cost.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data