logo
ProjectClosed

BR Sao Paulo Trains and Signalling

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

The development objective of the Sao Paulo Trains and Signaling Project for Brazil are to a) improve the level of service provided to the urban rail transport users in the Sao Paulo Metropolitan Region (SPMR) in a safe and cost-efficient manner by increasing the peak-hour and off-peak carrying capacity of Lines A and F of the Companhia Paulista de Trens Metropolitanos (CPTM) and Lines 1, 2, and 3

Status
Closed
Sector
Mass Transit, Rail, Automotive, Telecommunications, Government
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about BR Sao Paulo Trains and Signalling

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “BR Sao Paulo Trains and Signalling” is an infrastructure initiative in the Mass Transit sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The development objective of the Sao Paulo Trains and Signaling Project for Brazil are to a) improve the level of service provided to the urban rail transport users in the Sao Paulo Metropolitan Region (SPMR) in a safe and cost-efficient manner by increasing the peak-hour and off-peak carrying capacity of Lines A and F of the Companhia Paulista de Trens Metropolitanos (CPTM) and Lines 1, 2, and 3 of the Sao Paulo Metro Company (Metro); and b) continue the strengthening of the transport management and policy framework in the SPMR. There are two components to the project. The first component is the infrastructure and equipment. This component plan to acquire (i) forty trains (Electrical Multiple Units -EMUs) of eight cars each and accessories for the CPTM; (ii) seventeen trains of 6 cars each and accessories for the Metro; (iii) signaling , telecom and electrical related equipment and associated infrastructure for the CPTM; (iv) signaling and telecom equipment and associated infrastructure for the metro. This component accounts for about 97 percent of the total project cost, of which the train acquisition alone represents about 75 percent of the total project cost. The second component is the institutional and policy development which consists of : (a) consolidation of the Regional Transport Coordination Commission (CDTI); (b) updating of the integrated transport policy, land use, and air quality management strategy Integrated Urban Transport Project (PITU) to meet both transport and air quality targets and introduce sound cost-recovery, tariff, regulatory and subsidy policies; (c) preparation of an action plan to review the funding of the urban transport system in view of the adoption of the Bilhete-Unico-Integrado (BUI); and (d) project management and supervision. This component represents about 3 percent of the total project cost.

Original sector

FY17 - Public Administration,FY17 - Transportation

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Mass Transit, Rail, Automotive, Telecommunications, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project