Brack Wilson Lift Station Relocation
Sector: Water Supply and Storage • Location: Selma, North Carolina, United States of America
Source: Dodge USA
Brack Wilson Pump Station: Replacement and relocation and of existing 450 gpm pump station out of the flood zone. Project to include a new 450 gpm pump station, yard piping, electrical valves, vaults, generator, sheltor, demolition of existing pump station, connection to existing force main, reconfiguration of gravity sewer and associated appurtenances. Campground Pump station: Rehabilitation to i
- Status
- Under Construction
- Sector
- Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Government, Commercial
- Location
- Selma, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Brack Wilson Lift Station Relocation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Brack Wilson Pump Station: Replacement and relocation and of existing 450 gpm pump station out of the flood zone. Project to include a new 450 gpm pump station, yard piping, electrical valves, vaults, generator, sheltor, demolition of existing pump station, connection to existing force main, reconfiguration of gravity sewer and associated appurtenances. Campground Pump station: Rehabilitation to include sealing leaks in wet well. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Selma |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-06-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
