Brackley Commons Solar Project
Sector: Power Generation (CCGT) • Location: Prince Edward Island, Canada
Source: Infrastructure Canada
The project consists of the installation of pitched roof solar panels, inverter, optimizer and racking on the roof of the Brackley Commons which is the community gathering spot and recreational facility for the Rural Municipality of Brackley. The project will generate 13,670kWh/yr of electricity which is 109% of electricity required by the Commons. The purpose of the change the existing electricit
- Status
- Closed
- Sector
- Power Generation (CCGT), Solar
- Location
- Prince Edward Island, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Brackley Commons Solar Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of the installation of pitched roof solar panels, inverter, optimizer and racking on the roof of the Brackley Commons which is the community gathering spot and recreational facility for the Rural Municipality of Brackley. The project will generate 13,670kWh/yr of electricity which is 109% of electricity required by the Commons. The purpose of the change the existing electricity supply from traditional fossil fuels to clean solar energy. In addition to being aligned with the PEI’s Net Zero goal, installation of the solar panels will achieve a break-even point by year 7 and following year 7 will result in an approximate savings of $88,000 over the next 23 years. These savings can be reinvested into the community for other clean energy and recreational projects. |
Original sector | Green Energy |
Location
Country | Canada |
State | Prince Edward Island |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Solar |
Article published date | 2026-06-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
