Bradys Run Park Low Pressure Sewer Main
Sector: Water Supply and Storage • Location: Beaver, Pennsylvania, United States of America
Source: Dodge USA
The work under Contract No 2024-01 generally consists of the installation of thee (3) duplex grinder pump stations, three (3) quadruplex grinder pump stations, two (2) chemical feed systems including all electrical work and appurtenances, approximately 7,000-linear feet of 3-inch HDPE pressure sewer, approximately 4,000-linear feet of 2 HDPE pressure sewer, and the lining of approximately 575 line
- Status
- Closed
- Sector
- Water Supply and Storage, Chemical (Industrial), Power Generation (CCGT), Waste Processing and Treatment, Car parking, Government, Automotive, Commercial, Manufacturing (Industrial)
- Location
- Beaver, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Bradys Run Park Low Pressure Sewer Main
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work under Contract No 2024-01 generally consists of the installation of thee (3) duplex grinder pump stations, three (3) quadruplex grinder pump stations, two (2) chemical feed systems including all electrical work and appurtenances, approximately 7,000-linear feet of 3-inch HDPE pressure sewer, approximately 4,000-linear feet of 2 HDPE pressure sewer, and the lining of approximately 575 linear feet of gravity sewer , All construction work is proposed to be performed in the Bradys Run Pa... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Beaver |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Chemical (Industrial), Power Generation (CCGT), Waste Processing and Treatment, Car parking, Government, Automotive, Commercial, Manufacturing (Industrial) |
Article published date | 2024-03-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
