logo
ProjectBidding

Braly Boulevard Roadway Extension

Sector: Commercial • Location: Athens, Alabama, United States of America

Source: Dodge

BOULEVARD. The North section length will be 512 feet (0.10 miles). The South section length will be 740 feet (0.14 miles). This will be a ground up roadway construction project. The time allotted will be 180 calendar days for the base bid and an additional 15 days for each of the Utility bids (Alternates 2 & 3)if they are accepted. There are 2 base bids. The "Base Bid" and "Alternate 1". They are

Status
Prospective
Sector
Commercial, Power Transmission, Road, Power Generation (CCGT), Manufacturing (Industrial), Government
Location
Athens, Alabama, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Braly Boulevard Roadway Extension

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Braly Boulevard Roadway Extension” is an infrastructure initiative in the Commercial sector, located in Athens, Alabama, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

BOULEVARD. The North section length will be 512 feet (0.10 miles). The South section length will be 740 feet (0.14 miles). This will be a ground up roadway construction project. The time allotted will be 180 calendar days for the base bid and an additional 15 days for each of the Utility bids (Alternates 2 & 3)if they are accepted. There are 2 base bids. The "Base Bid" and "Alternate 1". They are very similar, but one will use coarse aggregate in the lower subgrade and the other will use soil...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Alabama

City

Athens

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Commercial, Power Transmission, Road, Power Generation (CCGT), Manufacturing (Industrial), Government

Article published date

2025-01-13

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project