Bramah Substation Energization Project
Sector: Energy • Location: York, Pennsylvania, United States
Source: PJM Inside Lines
A baseline immediate-need reliability project to energize the Bramah substation in York County, Pennsylvania, involving the construction of a new Peach Bottom-Bramah-Delta York 500 kV line. The project aims to mitigate generator deliverability violations and upgrade the Peach Bottom-Conastone 500 kV corridor.
- Status
- Prospective
- Sector
- Energy
- Location
- York, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- PJM Inside Lines
ConstructChat
Ask ConstructChat about Bramah Substation Energization Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A baseline immediate-need reliability project to energize the Bramah substation in York County, Pennsylvania, involving the construction of a new Peach Bottom-Bramah-Delta York 500 kV line. The project aims to mitigate generator deliverability violations and upgrade the Peach Bottom-Conastone 500 kV corridor. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | York |
Source
Source | PJM Inside Lines |
URL |
More Details
Record type | Project |
Article published date | 2026-07-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
