logo

Bramah Substation Energization Project

Sector: Energy • Location: York, Pennsylvania, United States

Source: PJM Inside Lines

Project
Planned

A baseline immediate-need reliability project to energize the Bramah substation in York County, Pennsylvania, involving the construction of a new Peach Bottom-Bramah-Delta York 500 kV line. The project aims to mitigate generator deliverability violations and upgrade the Peach Bottom-Conastone 500 kV corridor.

Status
Prospective
Sector
Energy
Location
York, Pennsylvania, United States of America
Updated
22 Jul 2026
Source
PJM Inside Lines

ConstructChat

Ask ConstructChat about Bramah Substation Energization Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Bramah Substation Energization Project” is an infrastructure initiative in the Energy sector, located in York, Pennsylvania, United States. Taiyo aggregates data on it from PJM Inside Lines.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A baseline immediate-need reliability project to energize the Bramah substation in York County, Pennsylvania, involving the construction of a new Peach Bottom-Bramah-Delta York 500 kV line. The project aims to mitigate generator deliverability violations and upgrade the Peach Bottom-Conastone 500 kV corridor.

Original sector

Energy

Location

Country

United States of America (USA)

State

Pennsylvania

City

York

Source

Source

PJM Inside Lines

URL

More Details

Record type

Project

Article published date

2026-07-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project