logo
ProjectPlanned

Branch Solar Project

Planned · Michigan · Last reported Mar 2025

Source: citybiz

The Branch Solar project is a 200 MW solar facility located in Branch County, Michigan. It will be NorthStar Clean Energy's largest solar asset in the state, contributing significantly to clean energy production.

Status
Prospective
Sector
Solar, Power Generation (CCGT)
Location
Michigan, United States of America
Updated
22 Jul 2026
Source
citybiz

ConstructChat

Ask ConstructChat about Branch Solar Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Branch Solar Project” is an infrastructure initiative in the Solar sector, located in Michigan, United States. Taiyo aggregates data on it from citybiz.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Branch Solar project is a 200 MW solar facility located in Branch County, Michigan. It will be NorthStar Clean Energy's largest solar asset in the state, contributing significantly to clean energy production.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Michigan

Source

Source

citybiz

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT)

Article published date

2025-03-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project