logo

Brannan Street Safety Project

Sector: Automotive • Location: San Francisco, California, United States of America

Source: SFMTA Projects

Project
Close

Brannan Street Safety Project Share this: Facebook Twitter LinkedIn SFMTA.com/Brannan Project Timeline Summer 2017 Outreach and Design Completed Fall 2018 Environmental Review Completed Early 2019 Project Approvals Completed Fall 2019 Construction Completed Project Status Legislated Implementation / Construction Completed Improvements Pedestrian Improvements Bike Improvements Transit Improvements

Project Information FAQ

Project Information

4 Q
The project “Brannan Street Safety Project” is an infrastructure initiative in the Automotive sector, located in San Francisco, California, United States of America. Taiyo aggregates data on it from SFMTA Projects.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Brannan Street Safety Project Share this: Facebook Twitter LinkedIn SFMTA.com/Brannan Project Timeline Summer 2017 Outreach and Design Completed Fall 2018 Environmental Review Completed Early 2019 Project Approvals Completed Fall 2019 Construction Completed Project Status Legislated Implementation / Construction Completed Improvements Pedestrian Improvements Bike Improvements Transit Improvements Improved travel flow at intersections Bus Routes and Rail Lines 30 Stockton 45 Union/Stockton 82X Levi Plaza Express (Suspended) Neighborhoods South of Market (SoMa) Mission Streets Brannan Street The Brannan Street Safety project is an effort to improve safety and comfort for all people traveling on Brannan Street between Division Street and The Embarcadero in the South of Market (SoMa) neighborhood. The project implemented a number of safety improvements, such as installing bike lanes, improving intersections, reconfiguring the traffic lanes, and upgrading traffic signal timing. This project is part of a comprehensive upgrade to the Brannan Street corridor. San Francisco Public Works began utility improvements in March 2018 and are installing a new sewer line, fiber optic cable, curb ramps, and repaving the roadway. The utility and repaving work concluded in August 2019. The installation of the approved safety and traffic improvements was completed in early Winter 2020. For more information about San Francisco Public Works’ Brannan Street Pavement Renovation and Sewer Replacement Project, please visit San Francisco Public Works’ Brannan Street Pavement Renovation and Sewer Replacement Project webpage . SAFETY NEEDS Between July 2011 and June 2016, there were 143 injury collisions, where one was fatal. Brannan Street is on the City’s High Injury Network, which are the 13 percent of city streets that account for 75 percent of San Francisco’s severe and fatal traffic injuries. The Brannan Street Safety project supports San Francisco’s Vision Zero goal of eliminating all traffic deaths by 2024. PROJECT DETAILS Brannan Street was generally a four-lane undivided roadway, providing a major access point to the I-280 freeway at 6th Street. Converting the street to a three-lane roadway with left-turn pockets improves traffic flow, while adding bicycle lanes provide safety enhancements and bicycle connectivity. The approved project design elements , include: Bike lanes in both directions to provide dedicated space for people riding bikes Traffic lane reduction to redistribute roadway space to all road users Center two-way left turn lane to allow flexibility for vehicles to turn left at alleys or driveways without blocking a travel lane Better designed intersections to provide left turning vehicles with a separated turning lane and pedestrian safety improvements through more visibility at intersections Traffic signal timing changes that will enhance safety and improve the efficiency of traffic flow STAKEHOLDER ENGAGEMENT From October 2017 to August 2018, the Brannan Street Safety Project team engaged various neighborhood groups including: South Beach | Rincon | Mission Bay Neighborhood Association, South Beach & Mission Bay Business Association, East Cut Central Business District, Eastern Neighborhoods Citizen Advisory Committee, and the Central Waterfront Advisory Group. During this time, the project team also mailed 6,300 postcards to properties near Brannan Street and walked door-to-door meeting with fronting properties to gather feedback on transportation safety concerns and changes to parking and loading. PROJECT FUNDING This project is funded by local Proposition B San Francisco General Fund. Contact Information Cameron Beck cameron.beck@sfmta.com

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data