Brasília Metro Future Line 2
Sector: Mass Transit • Location: Brasília, Federal District, Brazil
Source: Travel And Tour World
Technical feasibility studies are being advanced for the proposed Line 2 of the Brasília Metro, which is estimated to cost approximately BRL 20.4 billion (EUR 3.4 billion) and stretch nearly 60 kilometers, dramatically expanding metro coverage across Brasília.
- Status
- Prospective
- Sector
- Mass Transit, Rail, Government
- Location
- Brasília, Federal District, Brazil
- Updated
- 22 Jul 2026
- Source
- Travel And Tour World
ConstructChat
Ask ConstructChat about Brasília Metro Future Line 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | feasibility studies |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Technical feasibility studies are being advanced for the proposed Line 2 of the Brasília Metro, which is estimated to cost approximately BRL 20.4 billion (EUR 3.4 billion) and stretch nearly 60 kilometers, dramatically expanding metro coverage across Brasília. |
Original sector | Railway |
Location
Country | Brazil |
State | Federal District |
City | Brasília |
Source
Source | Travel And Tour World |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Rail, Government |
Article published date | 2026-07-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
