Braves Development Company
One of 10,000+ projects Taiyo tracks in Georgia.
Source: Dodge
This project is the construction of the new Braves Development Company office in the Three Ballpark Building at The Battery. The 7,652 SF space is a 1st generation space and is vacant. The work includes, but is not limited to, the following: millwork, construction of new partitions and ceilings, new finishes, appliances, specialty wall panels, and new MEP. millwork, doors/frames/hardware, glass, g
- Status
- Closed
- Sector
- Energy Storage, Residential, Manufacturing (Industrial), Commercial
- Location
- Atlanta, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Braves Development Company
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is the construction of the new Braves Development Company office in the Three Ballpark Building at The Battery. The 7,652 SF space is a 1st generation space and is vacant. The work includes, but is not limited to, the following: millwork, construction of new partitions and ceilings, new finishes, appliances, specialty wall panels, and new MEP. millwork, doors/frames/hardware, glass, glass film, drywall/ceilings, floors, paint, specialty wall and celling panels, appliances, plumbi... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Atlanta |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Residential, Manufacturing (Industrial), Commercial |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in United States of America
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 14 KW 35 MODULES AND 1 BATTERY 13.5 KWH ESS
- INSTALL (141) TESLA SOLAR ROOF TILES AT 10.152 KW TOTAL. INS TALL (13.5) KWH ENERGY STORAGE SYSTEM AND (N) LOAD CENTER
- 10' SUSPENDED WIRE PERIMETER SECRURITY SYSTEM INSIDE FENCE, BATTERY OPERATED LOW VOLTAGE
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 4.32 KW 12 MODULES AND INSTALL BACK-UP BATTERY 10.5 KWH, EQUIP. ON ENGINEERED FENCE
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 4.2 KW 12 MODULES 1 LG CHEM BATTERY 9.5 KWH
- REMOVE & REPLACE ANTENNAS, RRUS, BATTERY UNIT
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 10.8 KW 27 PANELS 1 NEW TESLA BATTERY NEW 100 AMP SOLAR PANEL
- PHASE 3-DATA CENTER- ENCOMPASSING OF PART OF 3RD FLOOR AHU ELECTRICAL ROOM,BATTERY ROOM,INSALL GENERATORS&EQUIP IN YARD
