Brays Bayou Greenways Segment BR15
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The installation of a 10 wide concrete trail, bridge ramp, various amenities such as benches, trash and recycle containers, drinking fountain, picnic tables, flag pole, and site lighting. Construction in, on, or near existing roadways will require a Traffic Control Plan. Construction also requires the implementation of Storm Water Pollution Prevention Plan and features. Disposal of any excess mate
- Status
- Prospective
- Sector
- Water Supply and Storage, Commercial, Road, Cement, Government, Bridge, Car parking, Automotive, Waste Processing and Treatment
- Location
- Houston, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Brays Bayou Greenways Segment BR15
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The installation of a 10 wide concrete trail, bridge ramp, various amenities such as benches, trash and recycle containers, drinking fountain, picnic tables, flag pole, and site lighting. Construction in, on, or near existing roadways will require a Traffic Control Plan. Construction also requires the implementation of Storm Water Pollution Prevention Plan and features. Disposal of any excess material and debris is the responsibility of the contractor. All disturbed areas are to be hydromulch... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Houston |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Road, Cement, Government, Bridge, Car parking, Automotive, Waste Processing and Treatment |
Article published date | 2024-11-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
