Brazil Electromobility Multiphase Programmatic Approach – MPA Phase 3 Boa Vista
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The proposed operation corresponds to Phase 3 of the Brazil Electromobility Multiphase Programmatic Approach (MPA) and aims to improve the quality of public transport and increase access to jobs in Boa Vista. Total cost is US$120 million, financed by a US$100 million IBRD loan to the Municipality of Boa Vista with a federal sovereign guarantee and US$20 million in local counterpart funding. The Pr
- Status
- Prospective
- Sector
- Road, Bridge, Solar, Mass Transit, Government
- Location
- Brazil
- Updated
- 19 Nov 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Brazil Electromobility Multiphase Programmatic Approach – MPA Phase 3 Boa Vista
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pipeline |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The proposed operation corresponds to Phase 3 of the Brazil Electromobility Multiphase Programmatic Approach (MPA) and aims to improve the quality of public transport and increase access to jobs in Boa Vista. Total cost is US$120 million, financed by a US$100 million IBRD loan to the Municipality of Boa Vista with a federal sovereign guarantee and US$20 million in local counterpart funding. The Project combines investments in: (i) modernization and electrification of the public transport system, including 40 electric buses, 10 solar-powered charging stations, full route restructuring, electronic fare collection and ITS, and 120 accessible bus shelters; (ii) inclusive ridership, through harassment prevention and response protocols and a fast-track program to qualify women as bus drivers; (iii) urban connectivity, with 46 km of strategic corridors rehabilitated under a complete streets approach, duplication of the bridge linking the northern and western neighborhoods and the UFRR campus to central areas, 37 km of segregated bike lanes, and 96 km of accessible sidewalks; and (iv) green corridors and public spaces along the city's igarapes, combining urban upgrading with nature-based solutions, the recovery of 32,000 m² of degraded land, and the planting of over 10,000 trees. |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Bridge, Solar, Mass Transit, Government |
Article published date | 2026-08-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
