Breitener Energetica
Sector: Commercial • Location: Brazil
Source: World Bank Group
The project comprises the construction and operation of a 162MW thermal power plant (diesel and fuel oil) in Fortaleza, state of Ceara. The company responsible for the project is Breitner Energetica SA, a consortium comprising Skanska BOT do Brasil (35%), a subsidiary of Skanska group; Empresa Industrial Tecnica (EIT) (24%), a Brazilian company; Orteng Equipamentos e Sistemas (5.5%), a subsidiary
- Status
- Closed
- Sector
- Commercial, Geothermal, Oil and Gas, Power Generation (CCGT), Government, Manufacturing (Industrial)
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Breitener Energetica
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Concluded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project comprises the construction and operation of a 162MW thermal power plant (diesel and fuel oil) in Fortaleza, state of Ceara. The company responsible for the project is Breitner Energetica SA, a consortium comprising Skanska BOT do Brasil (35%), a subsidiary of Skanska group; Empresa Industrial Tecnica (EIT) (24%), a Brazilian company; Orteng Equipamentos e Sistemas (5.5%), a subsidiary of Grupo Orteng; Enerconsult (5.5%), and Petrobras Distribuidora (30%). In November 2002, the plant was comissioned. The estimated total costs were US$113 million. In January 2002, Breitner Energetica signed a PPA with the Brazilian Commerce Chamber for Emergency Energy (CBEE), which is a two-year take-or-pay contract for the 7% of the plant’s capacity. Breitner’s power plant was part of a priority program for thermal power plants (Programa Prioritario de Termeletricas), implemented by the Brazilian federal government in 2000. The program, in order to foster the construction of thermal power plants, provided a short-term take-or-pay contract that expired in 2005 and, in some cases, financing for the construction of the plants (through the Brazilian Development Bank, BNDES). After the contract expired, the Breitener consortium decided to disassemble the Fortaleza Plant and move it to Manaus, where it signed a new 20 year power supply contract with Manaus Energia. None None |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Geothermal, Oil and Gas, Power Generation (CCGT), Government, Manufacturing (Industrial) |
Article published date | 2024-09-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia
