logo

Breitener Energetica

Sector: Commercial • Location: Brazil

Source: World Bank Group

Project
Concluded

The project comprises the construction and operation of a 162MW thermal power plant (diesel and fuel oil) in Fortaleza, state of Ceara. The company responsible for the project is Breitner Energetica SA, a consortium comprising Skanska BOT do Brasil (35%), a subsidiary of Skanska group; Empresa Industrial Tecnica (EIT) (24%), a Brazilian company; Orteng Equipamentos e Sistemas (5.5%), a subsidiary

Status
Closed
Sector
Commercial, Geothermal, Oil and Gas, Power Generation (CCGT), Government, Manufacturing (Industrial)
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Breitener Energetica

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Breitener Energetica” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Concluded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project comprises the construction and operation of a 162MW thermal power plant (diesel and fuel oil) in Fortaleza, state of Ceara. The company responsible for the project is Breitner Energetica SA, a consortium comprising Skanska BOT do Brasil (35%), a subsidiary of Skanska group; Empresa Industrial Tecnica (EIT) (24%), a Brazilian company; Orteng Equipamentos e Sistemas (5.5%), a subsidiary of Grupo Orteng; Enerconsult (5.5%), and Petrobras Distribuidora (30%). In November 2002, the plant was comissioned. The estimated total costs were US$113 million. In January 2002, Breitner Energetica signed a PPA with the Brazilian Commerce Chamber for Emergency Energy (CBEE), which is a two-year take-or-pay contract for the 7% of the plant’s capacity. Breitner’s power plant was part of a priority program for thermal power plants (Programa Prioritario de Termeletricas), implemented by the Brazilian federal government in 2000. The program, in order to foster the construction of thermal power plants, provided a short-term take-or-pay contract that expired in 2005 and, in some cases, financing for the construction of the plants (through the Brazilian Development Bank, BNDES). After the contract expired, the Breitener consortium decided to disassemble the Fortaleza Plant and move it to Manaus, where it signed a new 20 year power supply contract with Manaus Energia. None None

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Geothermal, Oil and Gas, Power Generation (CCGT), Government, Manufacturing (Industrial)

Article published date

2024-09-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project