logo

Breitener Energetica

Sector: Geothermal • Location: Brazil

Source: World Bank Group

Project
Concluded

The project comprises the construction and operation of a 162MW thermal power plant (diesel and fuel oil) in Fortaleza, state of Ceara. The company responsible for the project is Breitner Energetica SA, a consortium comprising Skanska BOT do Brasil (35%), a subsidiary of Skanska group; Empresa Industrial Tecnica (EIT) (24%), a Brazilian company; Orteng Equipamentos e Sistemas (5.5%), a subsidiary

Project Information FAQ

Project Information

5 Q
The project “Breitener Energetica” is an infrastructure initiative in the Geothermal sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

concluded

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project comprises the construction and operation of a 162MW thermal power plant (diesel and fuel oil) in Fortaleza, state of Ceara. The company responsible for the project is Breitner Energetica SA, a consortium comprising Skanska BOT do Brasil (35%), a subsidiary of Skanska group; Empresa Industrial Tecnica (EIT) (24%), a Brazilian company; Orteng Equipamentos e Sistemas (5.5%), a subsidiary of Grupo Orteng; Enerconsult (5.5%), and Petrobras Distribuidora (30%). In November 2002, the plant was comissioned. The estimated total costs were US$113 million. In January 2002, Breitner Energetica signed a PPA with the Brazilian Commerce Chamber for Emergency Energy (CBEE), which is a two-year take-or-pay contract for the 7% of the plant’s capacity. Breitner’s power plant was part of a priority program for thermal power plants (Programa Prioritario de Termeletricas), implemented by the Brazilian federal government in 2000. The program, in order to foster the construction of thermal power plants, provided a short-term take-or-pay contract that expired in 2005 and, in some cases, financing for the construction of the plants (through the Brazilian Development Bank, BNDES). After the contract expired, the Breitener consortium decided to disassemble the Fortaleza Plant and move it to Manaus, where it signed a new 20 year power supply contract with Manaus Energia. None None

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data