Brentwood Bay Sewer Project
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
This project will enhance the capacity to manage wastewater by replacing the Brentwood Bay pump station and construct sewer gravity main to re-route wastewater flows from the Brentwood Bay pump station to the Silverdale pump station. The project would also modify the Silverdale pump station to handle the increased flows from the Brentwood Bay pump station. The project works include: - Replacement
- Status
- Under Construction
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT), Road, Government
- Location
- British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Brentwood Bay Sewer Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will enhance the capacity to manage wastewater by replacing the Brentwood Bay pump station and construct sewer gravity main to re-route wastewater flows from the Brentwood Bay pump station to the Silverdale pump station. The project would also modify the Silverdale pump station to handle the increased flows from the Brentwood Bay pump station. The project works include: - Replacement of Brentwood Bay pump station with new pumphouse; - Installation of wet-well, chamber, pumps, backup power; - Replacement of approximately 3.5 km of forcemain; - Installation of approximately 800 m of new sanitary gravity main; - Decommissioning Hagan pump station and forcemain; - Reconfiguration of the existing sewer siphon to a gravity system; - Upgrades to the Silverdale lift station pumps; - Necessary appurtenances, civil, electrical and mechanical works; and, - Rehabilitation of roadworks impacted by project works. |
Original sector | Drinking Water and Wastewater |
Budget |
Location
Country | Canada |
State | British Columbia |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT), Road, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
