Breton Bay Water System Phase 1 Replacement
One of 10,000+ projects Taiyo tracks in Maryland.
Source: Dodge USA
will include waterline replacementalong Potomac View Dr, Spring House Ln, Meadow Dr, Meadow Way, Lake Cir, MeadowCt, Center 40 Cir, and Society Hill Rd between Potomac View Dr and South 40 Dr.Increased pipe size with 25 fire hydrants to allow for proper fire flow are alsoincluded in the design to provide a more reliable system.
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- California, Maryland, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Breton Bay Water System Phase 1 Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Design Development |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | will include waterline replacementalong Potomac View Dr, Spring House Ln, Meadow Dr, Meadow Way, Lake Cir, MeadowCt, Center 40 Cir, and Society Hill Rd between Potomac View Dr and South 40 Dr.Increased pipe size with 25 fire hydrants to allow for proper fire flow are alsoincluded in the design to provide a more reliable system. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Maryland |
City | California |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
