Brewster Road Water Main Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Replace approximately 4,000 feet of 16-inch concrete transmission water main along Brewster Road between Walton Blvd and Tienken Road in section 8 of the City. The water main is approximately 50 years old. This project excludes approximately 1,000 feet of 16-inch ductile iron water main between North Powderhorn Ridge Road and Hidden Valley Drive that was replaced in 2009. The water main will be re
- Status
- Prospective
- Sector
- Metal, Water Supply and Storage, Chemical (Industrial), Road, Cement, Government, Steel, Commercial, Manufacturing (Industrial)
- Location
- Rochester Hills, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Brewster Road Water Main Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Replace approximately 4,000 feet of 16-inch concrete transmission water main along Brewster Road between Walton Blvd and Tienken Road in section 8 of the City. The water main is approximately 50 years old. This project excludes approximately 1,000 feet of 16-inch ductile iron water main between North Powderhorn Ridge Road and Hidden Valley Drive that was replaced in 2009. The water main will be replaced with ductile iron pipe or high density polyethylene (HDPE) pipe (depends on installation m... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Rochester Hills |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Chemical (Industrial), Road, Cement, Government, Steel, Commercial, Manufacturing (Industrial) |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
