logo
ProjectPre-Design

Brewster Wind Project

Pre-design · British Columbia · Last reported Mar 2025

Source: Dodge

A 30-turbine wind farm with a capacity of up to 200 megawatts, to be constructed northwest of Campbell River. The project is expected to employ up to 275 workers during peak construction and produce enough renewable energy to supply over 56,000 average households in B.C. each year.

Status
Prospective
Sector
Wind, Raw Materials, Power Generation (CCGT), Commercial
Location
Campbell River, British Columbia, Canada
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Brewster Wind Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Brewster Wind Project” is an infrastructure initiative in the Wind sector, located in Campbell River, British Columbia, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

pre-design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

A 30-turbine wind farm with a capacity of up to 200 megawatts, to be constructed northwest of Campbell River. The project is expected to employ up to 275 workers during peak construction and produce enough renewable energy to supply over 56,000 average households in B.C. each year.

Procurement method

Budget

Location

Country

Canada

State

British Columbia

City

Campbell River

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Wind, Raw Materials, Power Generation (CCGT), Commercial

Article published date

2025-03-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project