Brewster Wind Project
Pre-design · British Columbia · Last reported Mar 2025
Source: Dodge
A 30-turbine wind farm with a capacity of up to 200 megawatts, to be constructed northwest of Campbell River. The project is expected to employ up to 275 workers during peak construction and produce enough renewable energy to supply over 56,000 average households in B.C. each year.
- Status
- Prospective
- Sector
- Wind, Raw Materials, Power Generation (CCGT), Commercial
- Location
- Campbell River, British Columbia, Canada
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Brewster Wind Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | A 30-turbine wind farm with a capacity of up to 200 megawatts, to be constructed northwest of Campbell River. The project is expected to employ up to 275 workers during peak construction and produce enough renewable energy to supply over 56,000 average households in B.C. each year. |
Procurement method | |
Budget |
Location
Country | Canada |
State | British Columbia |
City | Campbell River |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Wind, Raw Materials, Power Generation (CCGT), Commercial |
Article published date | 2025-03-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
